Pittsfield has filed applications for construction projects, called
Statements of Interest (SOI) by the Mass School Building Authority.
The last two, for Pittsfield and Taconic High, were filed in November of
2009. The SOI includes technical information about the target
facility and asks the applicant to include information as it pertains to
any one (or all) of 8 priority areas.
Pittsfield applied within the following three priority areas:
- Prevention of loss of accreditation
- Replacement,renovation or modernization of school facility systems,
such as roofs, windows, boilers, heating and ventilation systems, to
increase energy conservation and decrease energy related costs in a
school facility
- Replacement of or addition to obsolete buildings in order to provide
for a full range of programs consistent with state and approved local
requirements
Downloadable PDF versions of the full statements are provided below.
Pittsfield High School Statement of Interest (SOI)
Taconic High School Statement of Interest (SOI)